First PPA to produce organic eggs with solar energy

Despensa San Nicolás trusts in TSO to be the first organic food company in Spain to signs a PPA contract to produce organic eggs. These mass media have posted this project:

 

Energías Renovables         

 

       SolarNews

 

Energética XXI     

 

      Agenda Empresa

 

Hora Jaén       

 

      ESEFICIENCIA

 

FIRST PPA TO PRODUCE ORGANIC EGGS WITH SOLAR ENERGY

The South Oracle (TSO) is once again a pioneer in promoting self-consumption with solar energy through PPA in Spain. Despensa San Nicolas, a company from Jaen, has relied on TSO’s experience to become the first company to sign a solar PPA in the organic food sector in Spain to produce its organic eggs, characterised by their excellent quality and high nutritional value.

This company, which specialises in organic products, will install TSO’s ultralight flexible panel on the roof of its 700 m2 poultry farm. The installation will have a 10.40 kW power capacity, covering the 100% of its daytime electricity consumption. Thanks to the photovoltaic plant that will cover the roof of the organic egg farm, Despensa San Nicolas will stop emitting circa 145,000 kg of CO2 into the atmosphere within the warranty period of the plant, reducing its carbon footprint by approximately 10,000 trees.

The photovoltaic solar plant allows Despensa San Nicolas to complete its sustainable policy, which is a step forward in the environmental balance of the farm, where the birds are raised in open space conditions within an organic olive grove.

 

 

 

 

Energy efficiency and ECO20® certification (made with solar energy)

In order to testify its commitment to environmental sustainability and energy efficiency, Despensa San Nicolas will be awarded with the ECO20® seal, the only one to guarantee a 100% production with energy from the sun, which is certified by ECA Bureau Veritas.

 

First solar PPA into Spanish healthy sector

Clínica Beiman CPM Aljarafe has signed the first PPA into healthy sector and joins to energy solar self-consumption with TSO. You can check out here the media that posted it.

 

 

PV Magazine España     

    EnergyNews

 

Energías Renovables    

 

     ESEFICIENCIA

 

FuturEnergy           

TSO and Beiman CPM Aljarafe sign the first PPA contract into Spanish healthcare sector

TSO, The South Oracle, has signed the first PPA into healthcare sector with Beiman CPM Aljarafe clinic, a multidisciplinary leading center in Spain.

The clinic will have a solar plant of 41.6 kWp for instant self-consumption, which will be installed over its 200 square meter rooftop space with the ultralight flexible solar panel, exclusive of TSO.

This installation will cover 89.35% of health center’s annual electricity day hours consumption and will reduce its annual emissions of CO2 in 28.600 kg, reaching an accumulated decrease of 673.700 kg throughout its estimated useful life.

Through PPA contracts, TSO offers their customers a non-risk way of financing while it takes care of all the bureaucracy system, engineering, installation to start-up the photovoltaic solar plant. In addition, the customer fixes his electricity price for 10 years, independently to electricity market prices, and will benefit from 100% of the savings.

ECO20®: made with solar energy

Other advantages of TSO PPA contract is the seal ECO20® , which certifies that the healthcare center is powered with electricity from the sun.

Similarly, on December in 2017, The South Oracle was pioneer in the photovoltaic market with the first PPA contract into Spanish agro-food sector. The beneficiary company was Patatas Arrebola Group, a Sevillian firm, which now has an instant self-consumption solar photovoltaic plant of 41.28 kWp, with an annual production of 50,000 kWh. (It reduces 26 tons of CO2 emissions per year).